01

Define the feed after collection

Record composition, moisture, packaging and other contaminants, together with quantities and variability. Describe storage and transport. If preparation or separation changes the feed, assess the prepared material rather than assuming the incoming waste will behave the same way.

02

Use the same system boundary

Compare options on a common basis: collection, preprocessing, treatment, utilities, staffing and residual handling. For composting, anaerobic digestion, drying or combined routes, ask what supporting operations and infrastructure are included in the proposal and what remains outside it.

03

Check the destination of every output

List solid, liquid and gaseous outputs relevant to the concept. Identify proposed use, quality requirements, storage, transport and the alternative if an intended outlet is unavailable. A recovery claim is incomplete when product acceptance or residual management remains unresolved.

04

Turn uncertainty into a validation plan

Ask which assumptions are supported by representative data and which need testing. For mixed feedstocks, keep the characteristics of each stream visible. A shortlist may be the right first output when available information cannot yet support a final process choice.