01

Specify the decision and acceptance criteria

State whether the pilot is screening a process, comparing options, resolving an inhibition concern or informing a design step. Identify which performance, residual, operability and monitoring measures will determine the next decision.

02

Make the tested conditions visible

Document feed composition, loading, retention time, temperature, pH and important interventions. Record variability and periods of reduced performance as well as successful runs. Readers should be able to see which part of the intended operating range the test represents.

03

Review the whole response

Assess consistency, recovery after disturbance, by-products, sludge or other residuals and downstream implications. Keep analytical limitations visible. A result is harder to interpret if input conditions, system boundaries or measurement methods changed without explanation.

04

Separate demonstrated results from extrapolation

Identify questions that remain about hydraulics, mixing, transfer limitations, process control and operation at a larger scale. The next step may be additional testing or engineering review. A useful conclusion states both what the pilot supports and what it does not yet establish.